Installing wood flooring is one way to dress up a basement space.
Installing laminate flooring on concrete basement floor.
Working in a basement differs a bit from working on a first or second floor so you should keep a few things in mind when installing a laminate floor in a basement.
Next use a back saw to cut the wooden door jamb by holding it perfectly level.
In colorado dry basement built 1961.
Add about 10 to that number to account for any possible mistakes and warped boards.
However many homeowners are disappointed to discover that solid wood flooring cannot be installed on a concrete slab.
Multiply length times width of the room.
Laminate flooring is also fairly easy to install.
Installing laminate basement flooring.
When installing a laminate floor on top of old tile on top of concrete basement floor.
Laminate flooring works well in these areas and can add a touch of elegance to remodel projects.
Remove any carpet or other flooring.
The previous owner put the really old style tiles on top of concrete.
Place a piece of underlay on the concrete sub floor and a laminate board on top.
If the concrete subfloor is always dry however laminate floors can be placed directly on the slab.
There are also tiles missing here and there.
Then leave them for three days.
My contractor wants to install laminate on top of floor.
Keep in mind the average cost of laminate flooring is 1 sf to 5 sf.
Planks can be cut with a hand saw circular saw or flooring cutter and most laminate flooring comes in planks that simply snap together with a tongue.
Determine how much flooring and materials will be needed.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
Most diyers can complete laminate floor installation in one day.
Work with great care otherwise you might scratch the jambs.
Many types of flooring can be installed over a concrete sub floor.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
Laminate flooring is a good alternative to wood flooring in basements.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.
How to lay laminate flooring on concrete.
This is a fairly simple test to check for moisture in the concrete slab.